Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Aug 26, 2021     Left Wing Build-Up - (4.5 hours)       Category: Wings
I installed the fuel tank in the left wing. I connected the fuel line to the rear pickup fitting prior to install. Riveted root rib including the AN3-5A bolt on the top hole of the rear flange. I installed the fuel sight gauge with hose clamps provided. Finally, I applied proseal around cap assembly to form fillet as written in the plans. Left wing construction is complete except for wing tip install. I've decided to wait for Aerosport to offer their new carbon fiber wingtip to make final decision on which tip to install.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.